Restoration Pictures Pg. 2  

 

The first job was to remove the vinyl top. These roofs are not finished underneath so expect to do some fill work at the A pillars and above the opera windows. After the molding holes and remaining roof fill work is done the opera windows are welded in and filled. Thanks to Tony for the excellent roof work.

 

The next part prepared was the deck lid. It only needed a light sanding and to be cut in red. Then I got serious. The front came off on a weekend in April 01.

 

With the doghouse off, I blasted and painted the wheel liners and the core support. After the liners I pulled the doors off (HEAVY) and cut them in with E4 ford red.

<Back                                                              Jump To Page: 1 2 3 4 5 6 7 8                  Next>     

Back To Homepage