Restoration Pictures Pg. 2
The first job was to remove the vinyl top. These roofs are not finished underneath so expect to do some fill work at the A pillars and above the opera windows. | After the molding holes and remaining roof fill work is done the opera windows are welded in and filled. Thanks to Tony for the excellent roof work. |
The next part prepared was the deck lid. It only needed a light sanding and to be cut in red. | Then I got serious. The front came off on a weekend in April 01. |
With the doghouse off, I blasted and painted the wheel liners and the core support. | After the liners I pulled the doors off (HEAVY) and cut them in with E4 ford red. |